0
Shopping cart is empty

You are here

Edmundston

Let There be HEAT!

By admin

I work on Edmundston all winter long, and it gets pretty cold on the shore of Lake Ontario. I was able to get a furnace blower from Brendan Frezna when he put a new furnace in his house, so I put this in the duct work of Edmundston. We have air flow once again in Edmundston in a long time. The heat generated at the A end of the car will now be distributed through the car's duct work .... works amazing.

-Chris Fox

Read More

Edmundston's New Door

By admin

Edmundston gets a new end door, courtesy of Charls Gendron from Custom Trains. The door is off of Greenway, and Greenway now has Edmundston's old door.

Read More

Edumundston Update: September 2019

By admin

Today was a good day. I test fit my imagineering out flow for the toilets. I was able to fit new ABS drain pipe to the brass/copper original pipe through the original poop chute hole with a bit of modification.

This is what the closed system will look like for the two toilets in Bedrooms B and C. The space is quite small and under the car over your head even smaller. Here are some pictures - Chris Fox

Read More

Edmundston Blog: Summer 2018

By admin

aka "The Saga of Roomette no. 6 (and no. 10 too)"

Read More

Edmundston Update: October 2018

By admin

On October 23rd, Team Edmundston was back at it again with work centered towards the heating and water systems.

Read More

Edmundston Blog: 14 September 2018

By admin

Following the large work session under the B-end of our sleeper on September 8th, Chris had finally had enough and was determined to solve a longstanding issue with RPDX 1115 Edmundston.

Read More

Edmundston Blog: 8 September 2018

By admin

On September 8, 2018 it was decided to do a massive work session on Edmundston with Chris Fox and John Carey leading the way, with Rapido staff Jordan, Josh and Mike offering assistance.

Read More

SOCIAL MEDIA